Wall Signage - Static on Mumbai Airport

Mumbai Airport
Popular
Terminal 1 - Departures, Panels adjacent to Retail Outlets
Terminal 1 - Departures, Panels adjacent to Retail Outlets
Terminal 1 - Departures Inside SHA on Left Wall
Terminal 1 - Departures Inside SHA on Left Wall
Terminal 1 - Departures B, Overhead Check in Hall to SHA 2
Terminal 1 - Departures B, Overhead Check in Hall to SHA 2
Terminal 1 - Departures B, Check in Hall Outside Reserve
Terminal 1 - Departures B, Check in Hall Outside Reserve
Terminal 2 - L4, Enroute to Security Check
Terminal 2 - L4, Enroute to Security Check
Terminal 2 - L4, Enroute to Security Check
Terminal 2 - L4, Enroute to Security Check
T1 Arrival, Overhead 1B Arrival, Post Baggage Belt, Unit – 1, Size – 32Ft (W)X 13Ft (H),
T1 Arrival, Overhead 1B Arrival, Post Baggage Belt, Unit – 1, Size – 32Ft (W)X 13Ft (H),
T1B Departure, Sitting Area Security Hold Area
T1B Departure, Sitting Area Security Hold Area
T1 Departure, L4 Common Dep. Post Security Check
T1 Departure, L4 Common Dep. Post Security Check
Terminal 1 - Departures, Panels adjacent to Retail Outlets
sideBorder
Used For

Impact

sideBorder
Ad Type

Image

sideBorder
Lead Time (in days)

3

sideBorder
Span

15 days

Advertise on a large-format wall signage positioned in the Retail Arrival Hall and Baggage Belt area of T2 Domestic Terminal, offering brands a strong opportunity to engage passengers during their arrival journey. Single-sided display provides a prominent, high-impact brand presence in a key passenger touchpoint. The unit is non-lit and available as an exclusive single-unit placement.

Rack Rate

₹ 44,000 / Per Package Per Day

party-popper

TMA Offer

Login To View

Min Billing

₹ 500

Min Billing

₹ 500

Execution Details

Creative Specifications: image

Unit

ft

Format

PDF/CDR/AI

Detailed Dimension

Click Here To View

ADDITIONAL INSTRUCTIONS

Campaign Guidlines

Click Here To View

SOP

Proof Of Execution

Photograph with Newspaper Date

First Proof Of Execution(In Days)

2

Proof Of Execution Frequency

Start and End of the campaign

End of the campaign execution proof (In Days)

2